ONDA Plus SOM/ONDA Plus Hardware/Power and Reset/PL initialization signals

From DAVE Developer's Wiki
Jump to: navigation, search
History
Issue Date Notes
2026/05/18 First documentation release


PL initialization signals[edit | edit source]

This page provides information about the Programmable Logic (PL) initialization signals: PS_PROGRAM_B, PS_INIT_B, and PS_DONE.

Please refer to UltraScale Architecture PCB Design User Guide for more information about the usage and configuration of the initialization circuit and signals. As described in the link, the user can initialize the PL using these PS signals.

ONDA Plus SOM signals are configured in the following way:

Pin# Pin name Function Notes
J1.A33 PS_PROG_B Signal to reset configuration block Internal 10K Ω pull-up
J1.A34 PS_INIT_B Initialization completion indicator after POR Internal 10K Ω pull-up
J1.A32 PS_DONE PL programmed DONE signal Internal 10K Ω pull-up. It does not require any external pull-up or pull-down but can be used for connecting a user-led for a configuration completed indication (see for example ONDA EVK schematics).

These signals are referenced to the Bank 503 power rail, which operates at 1.8 V (see Processing System (PS) Bank Voltage).